PEAK DEMAND FORECAST (CONNECTED + SUPPRESSED LOAD)= 19,798.00MW @ 1400HRS

HIGHEST GENERATION=4,436.50MW@ 1400HRS

LOWEST GENERATION=1,269.08MW @ 1500HRS (1455Hrs, there was partial system disturbance. Details being awaited)

Source: NCC

Remark: Energy gap between peak demand forecast and highest generation is a pointer to the huge INVESTMENT opportunities in the power sector in Nigeria.

N.B.: This comparative data is very conservative when the energy situation in Nigeria (14,000MW installed generation capacity) is juxtaposed with nations like Brazil (181,532MW installed generation capacity) that has similar demographic characteristics.