PEAK DEMAND FORECAST (CONNECTED + SUPPRESSED LOAD)= 19,798.00MW @ 1915HRS
HIGHEST GENERATION=4,825.40MW@ 1915HRS
LOWEST GENERATION=2,828.65MW @ 0400HRS
Source: NCC
Remark: Energy gap between peak demand forecast and highest generation is a pointer to the huge INVESTMENT opportunities in the power sector in Nigeria.
N.B.: This comparative data is very conservative when the energy situation in Nigeria (14,000MW installed generation capacity) is juxtaposed with nations like Brazil (181,532MW installed generation capacity) that has similar demographic characteristics.
0 Comments